Skip to main content
View accessibility support page
Search
Search
Menu
Study
Research
Faculties
News and events
About
Get involved
Giving
Search
Search
Website navigation
Close
Key links
This section
Skip to section navigation
Global site navigation
Study
Course search
Apply
Fees and funding
Student life
Visit
Help centre
Request info
International students
Executive education
Summer schools
Research
Faculties
Faculty of Engineering
Faculty of Medicine
Faculty of Natural Sciences
Imperial College Business School
Administrative and support services
News and events
News
What's on
Imperial Stories
Great Exhibition Road Festival
Imperial Magazine
Imperial Lates
Graduation
About
President
Provost
Imperial Strategy
Academic Strategy
Imperial Global
Sustainable Imperial
Governance
Campuses
Our academics
Jobs at Imperial
Get involved
Giving
Schools outreach
Imperial Global Summer School
Societal engagement
Volunteering and outreach
Giving
User links navigation
For staff
Current students
Imperial for business
For schools
Alumni
Administration and support services
Capital Projects
navigation
About us
Project Management
Engineering Team
Health and safety
Approved suppliers
Project procedures
Project stages
Project processes
Projects Delivery
Set up project file (Stage 0)
Risk Management (Stages 0 to 6)
Programme (Stages 0 to 5)
Project Execution Plan (PEP) (Stages 1 to 6)
Value Management (Stages 1 to 6)
Project reporting (Stages 1 to 7)
Scope of services review meeting (Stages 2 to 4)
Handover strategy (Stages 2 to 5)
Project change (Stages 2 to 6)
Produce project factsheet (Stage 4)
Risk workshop with contractor (Stage 4)
Client site handover (Stage 4)
Record document strategy (Stage 4)
AICW (Stage 4)
Valuation (Stages 4 and 5)
Handover (Stage 6)
Project close out (Stages 6 and 7)
Project board
Evaluation and approval
Client brief (Stage 0)
Project feasibility (Stage 0)
Estates Committee Meeting (ECM) (Stages 0, 1 and 4)
Project Initiation Document (Stage 1)
Project board approval (Stages 1 to 4)
TAG/ERM (Stages 1 to 4)
User presentation (Stages 1 to 4)
Record of handover (Stage 6)
Suppliers performance review (Stage 7)
Post Project Review (Stage 7)
Pre-feasibility (Stage 0)
Design Management
Develop design brief (Stages 0 to 4)
Environmental and sustainability assessment (Stages 0 to 7)
Prepare Stage 1 report - feasibility study (Stage 1)
Town planning (Stages 1 to 4)
Project investigations/surveys (Stages 1 to 5)
Licences and agreements (Stage 2)
Prepare Stage 2 report - concept design (Stage 2)
BEMS design (Stages 3 to 5)
NEC Supervisor duties (Stages 3 to 6)
Prepare Stage 3 report - developed design (Stage 3)
Prepare Stage 4 report - technical design (Stage 4)
Record document delivery (Stages 5 and 6)
Construction and fabrication drawings (Stage 5)
Testing and commissioning (Stage 6)
Monitor and complete defects (Stage 7)
Post occupancy evaluation (Stage 7)
Design Stage reviews
Cost Management
Prefeasibility estimate (Stage 0)
Budget administration (Stages 1 to 7)
Feasibility cost estimate (Stage 1)
Establish VAT and insurance (Stage 1)
Cost plan (Stages 2 to 3)
Cost reporting (Stages 4 to 6)
Valuations (Stages 4 and 5)
Post take over cost management (Stage 7)
Procurement Management
Filing consultant tender and contract documents (Stage 0)
Outline procurement strategy (Stages 0 and 1)
Design Team procurement (Stages 0 to 4)
Main contract - PCSA (Stage 2)
Two Stage tender (Stages 2 and 3)
Insurances (Stages 2 to 4)
Single Stage tender (Stage 3)
Novation (Stage 4)
File contractor tender and contract documents (Stage 4)
Sub-contractor review (Stage 4)
Main contract - NEC (Stage 4)
Health and safety
Principal Designer (Stages 0 to 6)
Sustainable construction (Stages 1 to 6)
Health, safety and environmental assessment (Stages 1 to 3)
F10 notification (Stages 1 and 3)
Induction (Stages 1 to 3)
Pre-construction information (Stages 1 to 4)
Asbestos Management (Stages 1 to 6)
CDM notification (Stage 2)
Heath and safety file (Stages 3 and 6)
Decontamination certificate (Stage 4)
Construction phase plan (Stage 4)
Client safety induction (Stage 4)
Accident and incident reporting (Stage 5)
Site monitoring (Stage 5)
Application and review
College roles
Space and Building Information
Space database
Building Information
Architectural Standards Library
Lecture Theatres
Architectural Standards
Flooring Products
Ceiling Products
Wall Products
Seating Products
Offices
Architectural Standards
Student Accommodation
Architectural Standards
Laboratories
Architectural Standards
Flooring Products
Ceiling Products
Lab Benches
Fume Cupboards
Wall Products
Engineering
Common Spaces
Architectural Standards
Signage
Signage
Estates Records
Resources
Forms
College standards
Architectural standards
Guides and policies
Construction projects
Current projects
Completed projects
Michael Uren Building
I-XHUB White City Campus
Reynolds Bar Charing Cross
ACEX Lecture Theatre
Multi-disciplinary Labs
Past projects
In this section
Capital Projects
Capital Projects
Imperial Home
Administration and support services
Capital Projects
Resources
College standards
Architectural standards
Hand dryers N13
Hand dryers N13
Air-force-world-dryer.pdf
World-dryer.pdf