Building works level 5 Central Library
Building works to construct hoardings on Central Library level 5 will take place from Monday 13 February to Friday 17 February.
Noise will be kept to a mimimum.
Power tools will not be used after 09.00 but there will be some disturbance during the day while the works take place.
Article text (excluding photos or graphics) available under an Attribution-NonCommercial-ShareAlike Creative Commons license.
Photos and graphics subject to third party copyright used with permission or © Imperial College London.